Our Process
How A Torre Joinery Project Runs
The seven stages below apply to every job, but in Torre the first visit takes longest, because we spend more of it measuring old plaster and walls than talking about doors.
-
01
Visit and measured survey
We measure each alcove at the floor, at shoulder height and at the top, front and back, because they taper and lean. We note the skirting and picture rail profiles, and check whether the chimney breast is still live, capped or opened up. If the joinery involves the windows, we look at the sash boxes and cords too, and whether the house is a whole house or part of a converted villa.
-
02
Drawings you sign off
You get a drawn elevation and a plan, with real dimensions on them, before anything is priced as final. Door swings, drawer positions, where the sockets end up. It is much cheaper to move a shelf on paper than after it has been cut.
-
03
Timber selected and priced
We agree the species and the grade, and where it matters we pick the actual boards. Oak with heavy medullary rays looks completely different from quarter-sawn stock. The quote names the timber, the finish and the ironmongery, so you are comparing like with like against anyone else you ask.
-
04
Conditioning in the workshop
The timber sits in the workshop and settles towards the moisture content it will live at. BS EN 942 puts joinery for a house heated to between 12 and 21 degrees at 9 to 13 per cent. Skip this and the piece will do its moving after it is installed, in your hallway, rather than on our racks.
-
05
Machining and dry assembly
Cut, moulded and jointed, then dry-assembled on the bench so we find out about any problem while it is still in our building. Carcasses go together, doors are hung, drawers are fitted and adjusted. Nothing is finished until it has been put together at least once.
-
06
Finishing before delivery
Sprayed, oiled or hand-painted in the workshop, including the backs and the edges you will never see. Sealing five faces and leaving the sixth bare is how a panel takes up moisture unevenly and bows. Finishing off site also means no spray dust through your house.
-
07
Fitting and a snagging visit
Fitting a pair of alcove units usually takes a day. Carcasses go in first, packed level off the old boards, then the faces are scribed to the plaster and the skirting is returned round them. We caulk and fill the last joints and leave the painting edge clean. A few months on, after the heating has dried the room out, we come back to adjust the doors.