Ask what a bespoke kitchen costs and you will be given a range so wide it tells you nothing. The useful question is different: what are the six or seven things inside that number, and which of them is yours going to be big? A handmade kitchen from a Torquay workshop generally runs between £12,000 and £45,000 fitted, against roughly £10,000 to £30,000 for a mid-range showroom kitchen and £4,000 to £12,000 for trade units assembled on site. Those figures cover a huge amount of ground. What follows is a quote taken apart line by line, with the proportions that turn up again and again on the kitchens we price, so you can build your own estimate before anyone measures your room.

A Kitchen Quote Is Six Numbers, Not One

A single figure at the bottom of an email hides the only information that matters. Break a typical workshop kitchen quote apart and it lands in roughly these proportions: the cabinets themselves take about a third to 40 per cent, the doors and finish another fifth, the worktop somewhere between a tenth and a fifth, appliances a similar slice, and installation plus the other trades most of what remains.

Tall oak kitchen units with a stone worktop, a bespoke kitchen made in Torquay

Those shares move about depending on the job, and the moving is the point. A kitchen with modest fronts and a spectacular worktop is a different animal from one with hand-painted in-frame doors and a laminate top, even where the two totals match. Our bespoke kitchens page sets out the bands; this post is about the arithmetic underneath them.

Cabinets: The Part You Never Look At Twice

Carcasses are the least glamorous line and the one that decides how long the kitchen lasts. Eighteen-millimetre birch ply or moisture-resistant board with sealed edges behaves very differently over twenty years to standard chipboard with a foil wrap, particularly in a house near the water where a kitchen gets steamy twice a day and then cools right down.

Cabinet maker cutting panels in a workshop, the stage where most of a bespoke kitchen's cost is created

Drawer boxes sit in the same category. Dovetailed solid timber sides cost more than stapled boxes with a plastic collar and they are the single component most likely to be still working when the kitchen is handed to the next owner. A run of twelve to fifteen cabinets built this way, before any fronts go on them, will typically account for £5,000 to £14,000 of the total.

The other reason this line is large is that it is where made-to-size actually happens. Every cabinet drawn to fit a wall rather than pulled off a 300, 400, 500 and 600mm grid is a one-off, and one-offs are cut, jointed and squared individually.

Doors, Drawer Fronts And The Point Two Quotes Diverge

Fronts are what you see, so they carry weight out of proportion to their materials. A plain slab door in a sprayed finish, a five-piece shaker in tulipwood and a full in-frame kitchen where every door sits inside a face frame are three different amounts of work, and the third can be double the first across a whole kitchen.

Painted kitchen cabinet doors and drawer fronts, the element that varies most between quotes

In-frame construction is the one worth understanding before you compare prices. Hanging a door inside a frame means consistent shadow gaps on all four sides, which means the frame has to be dead square and the door fitted to it individually. It looks like a small detail on a drawing. It is several days of extra bench time across a kitchen, and it is frequently the entire explanation for a gap between two quotes that describe the same room.

Finish follows the same logic. Sprayed in the workshop gives the flattest surface; hand-painted can be touched up by you in ten years without anyone taking a door off. Neither is better. They fail differently, and you should be told which one you are buying.

The Worktop Is A Second Budget In Disguise

Worktops get treated as a line item when they behave like a project. Laminate on a full kitchen might be £600 to £1,200. Solid timber sits around £1,200 to £3,000. Quartz and granite are usually £2,500 to £6,000 once templating, cutouts, drainer grooves and upstands are counted, and the exotic end of stone goes well past that.

Granite worktop with an inset sink in a fitted kitchen, one of the largest single lines in a kitchen quote

Two practical notes. Stone is templated after the cabinets are installed, not before, so there is a gap of a week or two between fitting and the worktop landing. Plan on living with a plywood deck and a washing-up bowl for a few days. And where the joints fall in a stone or timber top is a decision somebody should make at the drawing stage rather than on the day, because a seam across the middle of an island is difficult to unsee.

The Trades Who Arrive Around Us

Joinery is rarely the only bill. Moving a sink or a hob pulls in a plumber; adding sockets, an induction hob or under-cabinet lighting pulls in an electrician; taking out a wall pulls in a builder and a structural engineer. On the kitchens we do, this cluster of work comes to somewhere between £1,500 and £6,000, and it is the part most often missing from the number a homeowner has in their head.

First fix plumbing and electrical work in a kitchen being refitted

It is also the part with rules attached. Electrical work in a kitchen falls under the building regulations, and the Planning Portal’s guidance on electrics in the home sets out what has to be notified. Most electricians handle that themselves through a competent person scheme rather than a separate building control application, but somebody has to be responsible for the certificate and you want to know who before work starts.

What A Torquay House Adds To The Bill

Local housing stock does real things to a quote. A great many Torquay kitchens started life as sculleries at the back of Victorian villas, which means a chimney breast in one corner, a window sill at an inconvenient height, a floor that has settled towards the garden and a ceiling with a cornice worth keeping. Every one of those is scribed work rather than standard work.

Older kitchen with a chimney breast and hearth, the kind of room a bespoke kitchen is built around in Torquay

Access is the quieter cost. Steep streets around the Warberries and Lincombes, terraces where the only parking is fifty metres away and down a flight of steps, and narrow hallways that decide how big a finished cabinet can be before it has to be assembled in the room - these add hours rather than materials, and an honest quote will have looked at them. The same problem shows up in bedrooms, which we went through in detail in our guide to what fitted wardrobes cost in Torquay.

Holiday lets are their own case. Torbay’s visitor economy is worth around £500 million a year, and a kitchen that meets four changeovers a month needs harder wearing surfaces, easier-to-clean detailing and parts that can be replaced quickly in season. Say so at the survey and the specification changes, usually for a few hundred pounds rather than thousands.

Three Honest Ways To Spend Less

Keeping the layout is the big one. Sink, hob and boiler staying where they are can take a four-figure sum off the plumbing and electrical work and shortens the job by days. If the layout genuinely does not work, move things - but move them because the room needs it, not because a drawing looks better with an island.

Kitchen mid-renovation with tools and materials, a room being refitted in phases

Second, mix. There is no rule that every cabinet has to be handmade. A workshop-built run where the room is awkward, alongside good quality standard units where the wall is straight and square, gets you the fit without paying bench rates for the easy metres. Third, phase it. Cabinets and worktop now, the pantry and the window seat next year, wiring and any structural work done once at the start so nothing is opened up twice. Which?’s fitted kitchen research is worth reading for the same reason: it is one of the few places you can compare what different routes actually deliver.

Before You Pay Anything, Get These Written Down

A deposit should follow a drawing, never a conversation. Ask for a scale plan and elevations, a written specification naming the carcass material, the door construction, the finish and who applies it, the worktop material and edge detail, the appliance list with model numbers, and a clear line on which trades are in the price and which you are arranging.

Homeowners going through kitchen drawings and paperwork at a kitchen table before signing

Then ask the two questions that separate quotes properly. What happens if the walls turn out worse than they looked, and who pays for it? And what is the snagging arrangement once the kitchen is in? Doors settle in a heated house. Somebody should be coming back a few weeks later to adjust them, and a firm that has thought about it will say so without being pushed.

If you would like a real figure for your own room, chimney breast and all, get a free quote and we will come and measure it properly.

Questions

Questions On This


Is a handmade kitchen always more expensive than a showroom one?
Not always, and that surprises people. A mid-range showroom kitchen with upgraded doors, a stone worktop and a designer's commission on top can land in the same place as a workshop-made kitchen of the same size. Where the gap opens up is at the two ends: nothing we make competes with a £5,000 trade kitchen, and nothing off a showroom floor competes with a run of hand-built cabinets scribed into a room that has no straight walls.
What proportion of a kitchen quote is labour?
Roughly a third to a half of a workshop-made kitchen is time rather than materials, and most of that time is spent before anything arrives at your house. Machining, jointing, assembling and finishing cabinets happens at the bench over several weeks. The fitting week that homeowners picture as the expensive part is usually the smaller half of the labour bill.
Do I have to buy the appliances through the kitchen maker?
No, and you will often do better buying them yourself. We need the model numbers early because cabinet openings are built around specific appliances, but there is no reason to pay a joiner a margin on a dishwasher. Send us the spec sheets, buy them where they are cheapest, and have them delivered before fitting week starts.
How much should a Torquay kitchen deposit be?
A quarter to a third on approval of the drawings is normal, with a second stage payment when the cabinets are made and a final balance after the snagging visit. Materials for a handmade kitchen are bought weeks ahead, which is what the first payment covers. A request for the full amount before anything is made is not standard and you are entitled to ask why.

Coverage

Where We Work


Most of our work sits inside Torbay, because fitted joinery needs at least two visits and often three. Further out we go as far as the drive stays sensible - Newton Abbot and Totnes are routine, and we have taken work down to the South Hams when the job justified it.

Across Torquay

And across South Devon

Or go straight to a service

Send Us The Awkward Corner


The jobs we like most are the ones other people have measured and walked away from. Send a photo and a rough size and we will tell you honestly whether it is worth making, and roughly what it would come to.